WorkHive WorkHive

Voltage Drop Calculator

The Voltage Drop Calculator finds the percentage voltage drop on a cable run and checks it against the PEC/NEC limit. Example: for a 60 A 3-phase feeder over 45 m of 25 mm² copper cable at 400 V, Voltage drop = 0.98 %, Drop = 3.92 V, Limit = 3 % (per PEC 2017 Art. 2.10.19 | NEC 210.19).

How it works

Computed from your inputs per PEC 2017 Art. 2.10.19 | NEC 210.19.

Worked example (Electrical & Power)

Inputs: a 60 A 3-phase feeder over 45 m of 25 mm² copper cable at 400 V.

ResultValue
Voltage drop0.98 %
Drop3.92 V
Limit3 %

Computed live by WorkHive's calculation engine; standard: PEC 2017 Art. 2.10.19 | NEC 210.19.

How to use this calculator

  1. Enter the figures for the duty you are sizing: the worked example below uses a 60 A 3-phase feeder over 45 m of 25 mm² copper cable at 400 V.
  2. The calculator returns Voltage drop, Drop, Limit, computed per PEC 2017 Art. 2.10.19 | NEC 210.19.
  3. Check the worked example to confirm the method matches how you would do it by hand, then run your own numbers in the interactive tool.

FAQ

What is a voltage drop calculator cable PEC?

The Voltage Drop Calculator is a free online tool that computes finds the percentage voltage drop on a cable run and checks it against the PEC/NEC limit. It shows the formula and a fully worked example so you can check the method, not just the number.

How is it calculated?

The result is computed from your inputs following PEC 2017 Art. 2.10.19 | NEC 210.19. The worked example on this page shows a real computation with real numbers.

Is the calculator free?

Yes. WorkHive's engineering calculators are free to use, no sign-up needed for the tools. WorkHive is a free, offline-first maintenance platform built for Philippine industrial plants.

Run it on your own numbers

Open the interactive Voltage Drop Calculator in WorkHive: free, no sign-up needed for the calculators.